Home
Russian version
Sitemap
  • A
  • A
  • A
Telegram
VK
Одноклассники
TikTok
Russian Grids
IDGC
  • About company
  • Company news
  • Information for shareholders and investors
Advanced search
  • Home page »
  • Company news »
  • Rosseti North-West
Company news
  • Rosseti North-West
  • Russian Grids
  • Announcements of events
  • Contacts
  • Arkhenergo branch of IDGC of the North-West having invested 13.5 mln RUR in reconstruction of grids in the Onega District

    Arkhenergo branch of IDGC of the North-West having invested 13.5 mln RUR in reconstruction of grids in the Onega District

    4 апреля 2012
    The line is a “carryover” facility of 2011 Investment Program.
  • All IDGC of the North-West branches having achieved the planned performance in terms of provided services quality level in 2011. Alongside with the provided services reliability level, this indicator is accounted for during formation of tariffs.

    All IDGC of the North-West branches having achieved the planned performance in terms of provided services quality level in 2011. Alongside with the provided services reliability level, this indicator is accounted for during formation of tariffs.

    4 апреля 2012
    In 2012, the company branches for the first time submitted to regional tariff authorities reports on achievement of the quality indicator level planned for the year.
  • IDGC of the North-West through with Pskovenergoavto SDC liquidation procedure

    IDGC of the North-West through with Pskovenergoavto SDC liquidation procedure

    26 марта 2012
    A record on termination of activities of the legal entity due to its liquidation was entered in the Uniform State Register of Legal Entities on March 22, 2012.
  • Work for corrected RAB-regulation parameters agreement going on

    Work for corrected RAB-regulation parameters agreement going on

    26 марта 2012
    IDGC of the North-West has prepared and forwarded to the regional regulators all the materials required. The documents consideration by the Federal Tariff Service of Russia began in the middle of March.
  • Appointment of new Deputy Chief Engineer within IDGC of the North-West

    Appointment of new Deputy Chief Engineer within IDGC of the North-West

    26 марта 2012
    Oleg Anfimov has been appointed Deputy Chief Engineer for Operational Technological Management – Head of the Operational Technological Management Department of IDGC of the North-West, JSC.
  • Residual value of IDGC of the North-West non-core assets amounting to 0.2% of the Company’s fixed assets value

    Residual value of IDGC of the North-West non-core assets amounting to 0.2% of the Company’s fixed assets value

    23 марта 2012
    IDGC of the North-West plans to sell all economically ineffective non-core assets within the framework of IDGC Holding Strategy implementation.
  • “Vologdaenergo” branch of IDGC of the North-West having for the first time installed and commissioned state-of-the-art absolute selectivity protections on 110 kV overhead lines

    “Vologdaenergo” branch of IDGC of the North-West having for the first time installed and commissioned state-of-the-art absolute selectivity protections on 110 kV overhead lines

    22 марта 2012
    The cutting-edge equipment of domestic produce is intended for prompt disconnection of damaged grid sections to prevent emergency situations.
  • IDGC of the North-West planning to sell all economically ineffective non-core assets within the framework of IDGC Holding Strategy implementation

    IDGC of the North-West planning to sell all economically ineffective non-core assets within the framework of IDGC Holding Strategy implementation

    21 марта 2012
    A report on the results on non-core assets divestiture is planned to be submitted to the Board of Directors of IDGC of the North-West in Q1 2013
  • Committee for Strategy and Development under the Board of Directors of IDGC of the North-West having considered the Plan of Implementation of IDGC Holding Development Strategy within the Company till 2015 and prospectively – till 2020.

    Committee for Strategy and Development under the Board of Directors of IDGC of the North-West having considered the Plan of Implementation of IDGC Holding Development Strategy within the Company till 2015 and prospectively – till 2020.

    20 марта 2012
    The document was presented by General Director of IDGC of the North-West Alexander Kukhmay.
  • “Karelenergo” branch of IDGC of the North-West to complete capital repair of two northern direction 110 kV lines in H1 2012

    “Karelenergo” branch of IDGC of the North-West to complete capital repair of two northern direction 110 kV lines in H1 2012

    20 марта 2012
    The capital repair program of “Karelenergo” branch of IDGC of the North-West, JSC for 2012 has been approved in an amount of 159 mln RUR.

  • Новости 361 - 370 из 405
    Начало | Пред. | 35 36 37 38 39 | След. | Конец
© 2004–2025 Rosseti North-West
Contact information
Sitemap
Print